top of page

TECHNICAL REPORTS

Technical Report 1, Part 1 - Lighting Proposal Memo

Technical Report 1, Part 2 - Existing Lighting Conditions

Technical Report 2 - Electrical System Analysis

Technical Report 3 - Preliminary Schematic Lighting Design

Technical Report 4A - Final Schematic Lighting Design

Conewago Enterprises Office Facility

Hanover, Pennsylvania

Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work-in progress for this thesis project. Modifications and changes to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Collin Jones. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.

This page was last updated on April 18, 2017 by Collin Jones and is hosted by the AE Department ©2016-2017

bottom of page