top of page

Links to the final report and appendices are listed below. This report is a culmination of design and documentation that was created during spring semester of 2017. This project covers an extensive redesign of the lighting and electrical systems for Conewago Office Facility, as well as a breadth analyses for mechanical and acoustics. 

Executive Summary

Final Report

Appendices Only

Final Report

Conewago Enterprises Office Facility

Hanover, Pennsylvania

Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work-in progress for this thesis project. Modifications and changes to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Collin Jones. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.

This page was last updated on April 18, 2017 by Collin Jones and is hosted by the AE Department ©2016-2017

bottom of page